Los Angeles Metropolitan Transportation Authority (METRO), Eastbound SR-91 Atlantic Avenue to Cherry Avenue Auxiliary Lanes (PAED & PS&E)
Los Angeles Metropolitan Transportation Authority (METRO), Eastbound SR-91 Atlantic Avenue to Cherry Avenue Auxiliary Lanes (PAED & PS&E)
This Metro project will add an eastbound auxiliary lane between the I-710 Freeway on-ramp and the Cherry Avenue off-ramp on the SR-91. This project is part of Metro’s I-605 Hot Spot Program, which is focused on making improvements that will help to reduce chronic traffic congestion and enhance safety for drivers along the I-605 Freeway and the SR-91.
Guida’s services on this project included, but were not limited to, performing corridor control surveys; performing project control surveys; performing supplemental control surveys; preparing base mapping; preparing base photogrammetric maps and products; conducting initial Land Net recovery and field ties; preliminary boundary determination; surveying all project boring and pothole locations; preparing right of way plans and appraisal maps.
OUR PROMISE
As an SBE/WBE firm ourselves, we have always strongly believed in the promotion and utilization of other small and disadvantaged business enterprises. We are thankful for the opportunities we have had to demonstrate our commitment to this promise by helping our clients accomplish their utilization goals.
CORPORATE
(949) 777-2000
HEADQUARTERS
Orange County, CA
CONNECT WITH US