Orange County Public Works Department
SARI Mainline Tunnel Monitoring
Orange County Public Works Department, SARI Mainline Tunnel Monitoring
Guida provided surveying services as a subconsultant to the Vadnais Corporation for tunneling of the Santa Ana Regional Interceptor (SARI) Brine line. This major pipeline project included recovery and verifying control for 5 shafts and 7 drives, transferring control to bottom of shaft and monitoring of the 7 drives, and monitoring for 70 days of line and grade variations of each drive. Guida provided a report and as-builts of the operation.
OUR PROMISE
As an SBE/WBE firm ourselves, we have always strongly believed in the promotion and utilization of other small and disadvantaged business enterprises. We are thankful for the opportunities we have had to demonstrate our commitment to this promise by helping our clients accomplish their utilization goals.
CORPORATE
(949) 777-2000
HEADQUARTERS
Orange County, CA
CONNECT WITH US